Back to Blog
Cost & EstimationEstimating & Costing

Construction Labour Rates India 2026: ₹450–₹1,200/Day by State

Unskilled ₹450–₹650/day, mason ₹600–₹900. State-wise 2026 rates + overtime rules. Use our free Labour Cost Estimator for instant project budgets.

3 min read
By Yojo Team
Published: 25 January 2026
Construction Labour Rates India 2026: ₹450–₹1,200/Day by State - Yojo construction management blog

Introduction

Construction labour rates in India vary by state, skill level, and project type. This guide covers typical daily wages for unskilled, semi-skilled, and skilled workers in 2026, plus overtime rules and how to estimate labour cost for your project.

Quick estimate: Use our Labour Cost Estimator to get state-wise labour costs instantly.

Skill Categories and Typical Daily Rates (2026)

Skill LevelRolesDaily Rate Range (₹)
UnskilledHelper, mazdoor, bhisti450 – 650
Semi-skilledMason, carpenter, painter, plumber, electrician600 – 900
SkilledSupervisor, fitter, experienced specialist800 – 1,200+

Rates are approximate. Metro cities (Mumbai, Delhi, Bangalore) tend to be 15–25% higher than tier-2 cities.

State-Wise Variation

Labour rates are set by state governments under the Minimum Wages Act. Key factors:

  • Cost of living – Metro vs small town
  • Demand – High-activity states (Maharashtra, Karnataka, Gujarat) often pay more
  • Skill availability – Shortage of skilled workers increases rates

Sample State Ranges (Unskilled Construction Worker)

StateApprox Daily (₹)
Maharashtra550 – 700
Delhi550 – 680
Karnataka500 – 650
Tamil Nadu480 – 620
Gujarat500 – 640
Uttar Pradesh450 – 580
Bihar / Jharkhand420 – 550

Check your state labour department for notified minimum wages. Our minimum wage calculator helps with state-wise lookups.

Overtime Rules

  • Standard: 1.5× (time and a half) the hourly rate for overtime
  • Some states: 2× for hours beyond the first 2 hours of OT
  • Hourly rate: Daily wage ÷ 8 hours (standard working day)

Example: ₹600/day base → ₹75/hour → OT = ₹112.50/hour (1.5×)

For exact calculation, use our overtime calculator and daily wage with overtime and advance deduction calculator.

How to Estimate Labour Cost for Your Project

  1. List activities – Masonry, carpentry, plastering, plumbing, etc.
  2. Estimate man-days – Workers × days per activity
  3. Apply state-wise rates – Use Labour Cost Estimator
  4. Add overtime – If work exceeds 8 hours/day
  5. Add supervisory cost – Site engineer, mukadam (10–15% of labour)

Tip: Track actual labour and wages with Yojo contractor app to compare estimate vs actual and control cost.

Compliance: Muster Roll and Wage Records

Under the BOCW Act, contractors must maintain:

  • Muster roll – Daily attendance
  • Wage register – Payment records
  • Overtime records

Use our muster roll generator to create BOCW-compliant records. Digital attendance tracking reduces errors and wage disputes.

Tips to Manage Labour Cost

  1. Get multiple quotes – Compare local labour rates before finalising
  2. Use piece-rate where suitable – Can be more efficient than daily wage for measurable work
  3. Track attendance properly – Prevent fake attendance and labour leakage
  4. Plan overtime – Budget for OT; avoid surprise costs
  5. Maintain records – Muster roll, advances, deductions for smooth payments

Conclusion

Construction labour rates in India (2026) range from ₹450–₹650/day (unskilled) to ₹800–₹1,200+/day (skilled), varying by state. Use our Labour Cost Estimator for project budgeting. Track actual wages and attendance with Yojo contractor app to stay on budget and maintain compliance.

Ready to Transform Your Construction Business?

Start managing your sites efficiently with Yojo today.

Try Yojo Free
Share this article:
Reviewed By

Construction Management Expert

Senior Construction Consultant at Yojo

10+ Years ExperienceCertified Construction Manager

10+ years of experience

Reviewed on 25 January 2026

Y

About Yojo Team

Construction management expert with 10+ years of experience helping Indian contractors build better businesses. Specialized in digital transformation for construction sites.

Construction Management Expert10+ Years Experience
Expertise:
Construction ManagementLabour ManagementSite Operations

Mumbai Material Rates Today

Current market rates for construction materials in Mumbai, Maharashtra

Cement (per bag)
420
Updated today
Steel TMT (per ton)
65,000
Updated today
Sand (per unit)
1800
Updated today

Rates are indicative and may vary by supplier and location

View Mumbai page

Frequently Asked Questions

Download Yojo App

Get the Play Store link on WhatsApp.

Download Free

Download Yojo

Enter your email and WhatsApp number. We'll send the Play Store link on WhatsApp.

Yojo Team Management
Yojo Sites Management